How BILDRY works
BILDRY turns simple project parameters into a real construction plan — following U.S. construction logic, not generic templates.
Enter project parameters
You describe the project — not the schedule. No Gantt charts, no sequencing, no construction expertise required.
- Location: state, city, county (U.S.)
- Project type (single-family, multi-family, etc.)
- Area, floors, structure type
- Start date and target completion (optional)
- Work calendar and basic constraints
Automatic generation
BILDRY analyzes construction logic, dependencies and productivity norms to build a realistic schedule.
- Builds a detailed Work Breakdown Structure (WBS)
- Calculates task durations using man-hour norms
- Applies correct sequencing and parallel work
- Inserts inspections and mandatory pauses
- Identifies the critical path
Review the results
You receive a professional construction plan — ready to review, export or explain to others.
- Day-by-day Gantt chart
- Parallel tasks and dependencies
- Required crews, roles and man-hours per task
- Clear responsibility structure (GC, Superintendent, Subs)
- Human-readable explanation mode
What BILDRY takes into account
Every schedule is generated using real-world constraints — not optimistic assumptions.
Productivity norms
Industry-standard man-hour logic for estimating task duration and crew size.
Climate & seasonality
Weather-sensitive tasks are scheduled according to regional climate conditions.
Inspections & approvals
Mandatory inspections and approval checkpoints are built into the schedule.
What BILDRY does NOT do
BILDRY does not replace a licensed General Contractor, construction manager or design professional.
The generated schedule is a planning and estimation tool, based on average productivity and standard conditions.
Actual construction timelines depend on permits, contractors, weather, supply chains and site conditions.