STEP 01

Enter project parameters

You describe the project — not the schedule. No Gantt charts, no sequencing, no construction expertise required.

  • Location: state, city, county (U.S.)
  • Project type (single-family, multi-family, etc.)
  • Area, floors, structure type
  • Start date and target completion (optional)
  • Work calendar and basic constraints
STEP 02

Automatic generation

BILDRY analyzes construction logic, dependencies and productivity norms to build a realistic schedule.

  • Builds a detailed Work Breakdown Structure (WBS)
  • Calculates task durations using man-hour norms
  • Applies correct sequencing and parallel work
  • Inserts inspections and mandatory pauses
  • Identifies the critical path
STEP 03

Review the results

You receive a professional construction plan — ready to review, export or explain to others.

  • Day-by-day Gantt chart
  • Parallel tasks and dependencies
  • Required crews, roles and man-hours per task
  • Clear responsibility structure (GC, Superintendent, Subs)
  • Human-readable explanation mode

What BILDRY takes into account

Every schedule is generated using real-world constraints — not optimistic assumptions.

Productivity norms

Industry-standard man-hour logic for estimating task duration and crew size.

Climate & seasonality

Weather-sensitive tasks are scheduled according to regional climate conditions.

Inspections & approvals

Mandatory inspections and approval checkpoints are built into the schedule.

What BILDRY does NOT do

BILDRY does not replace a licensed General Contractor, construction manager or design professional.

The generated schedule is a planning and estimation tool, based on average productivity and standard conditions.

Actual construction timelines depend on permits, contractors, weather, supply chains and site conditions.

See it on your own project

Create one project for free and experience construction planning on autopilot.

Create free project